Well yesterday we had our Temp Power Inspection and we PASSED!!!! Yah!!! I also called the electric company which said it would 3-4 days from today before we would see power. So today Rob and I after going to his Orthopaedic appt went and picked up some stuff for the a/c to finish it up. He found out when he started cutting into the line that he had a live wire (zap). They jumped our 6 foot fence (locked) and installed the meter and turned the power on.... CRAZY!!! Also yesterday with the help of a new friend we finished the drywall. We also had help from my girlfriend Teresa and her son over the weekend and also a couple we have friended here. We are very blessed with all the help we have received. Tommorrow or thursday I will run by and take some photos. I need to finish screwing in all the drywall, start mudding and finish laying the floor in the temporary kitchen. YAH!!! Getting closer. We have also lengthened our lease by 2 weeks so we can get in with out stressing out. So, whats left to do:
Kitchen:
*Install cabinets, sink, remainder of floor and applainces (including bleaching my very nasty fridge)
Bathroom:
*Install enclosure around tub and finish plumbing
Master Bedroom:
* Patch Ceiling
** Finishing Screwing in Drywall, then mud and paint.
Outside:
* Install skirting, finish grading, add small deck w/ steps at each door
A/C
* Clean Ducts, Install Filter Ducts, Install the heater strips, hook up the power and run them
* Cover Ducting on side of the house.
Water:
** Flush Water System, Cap and test for leaks.
And then we are done......