Monday, April 4, 2011

We've made some progress, I have just been slacking on the photo progress.  Currently all 3 of the kids room walls/ceilings are textured and painted.  Rob is also in the process of adding a 2nd bathroom to the house by the kids room.  Also have the walls up for what will be a tv area for the kids.  In the bathroom we need to plumb the toilet and shower, texture the walls and ceilings, add a mirror and light strip, put in the toilet, put in shower stall currently in our bathroom, and add the flooring.  The tv room needs texture of walls and ceiling and flooring and the kids room needs flooring.  And baseboards through out all of these spaces.  Not sure how long it will take us to do this as we have had a turn in Rob's business and money is just not there.